Industrial Use Large Beer Brewery Equipment

FOB Reference Price:Get Latest Price
$93,000.00 - $107,000.00 / Sets | 1 Set/Sets High Quality Industrial Use Large Beer Brewery Equipment (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Processing:
Fermenting Equipment
Condition:
New
Place of Origin:
Shandong, China (Mainland)
Brand Name:
SDET
Model Number:
Custom-design
Processing Types:
Carbonated Beverage
Voltage:
Adjustable
Power(W):
Depends
Dimension(L*W*H):
According to needs
Weight:
Depends on Volume
Certification:
CE PED ISO
Product Name:
High Quality Industrial Use Large Beer Brewery Equipment
Cooling jacket:
Miller board or Ice water belt
Material of Pump:
SUS304/316
Fermenter cone:
60-75°
Inner Thickness:
3.0mm
Temperature measurement way:
PT100
Manhole of brewhouse:
Glass manhole
Heating method:
Steam heating/Direct fire/Electric
Manhole of Fermenter:
Top or side mahole
Washing system:
CIP cleaning, 360° spray ball
After-sales Service Provided:
Engineers available to service machinery overseas
Warranty:
5Years
Supply Ability
Supply Ability:
30 Set/Sets per Month High Quality Industrial Use Large Beer Brewery Equipment
Packaging & Delivery
Packaging Details
1. Ship stainless steel mash tun by LCL or FCL
2. Packed false bottom mash tun with plastic film or bubble film
3. Fix with iron frame for big tank, lay down in the container
4. Fumigation free wooden case for small capacity by LCL
Port
Qingdao

 High Quality Industrial Use Large Beer Brewery Equipment

 - This set of large beer brewery equipment brewhouse can be 3000L or 5000L.

-This set of brewery equipment fermenter can be 6000L or 10000L, depends on needs.

 

 

Brewery Description

Malt Milling System

1. Malt Mill: Material:carbon steel and chrome plate roller;

2. Double roller type malt mill machine;

3. Equipped with motor,belt pulley,belts,etc;

4. Working capacity, power and dimension is decided according to mashing system.

This part is the necessary part among the whole brewery equipment.

Mashing System

Mashing/Lauter Tank:

1. Inner-Jacket (SUS304 SS) thickness: 3.0-4.0mm;

2. External-Jacket (SUS304 SS) thickness: 2.0-4.0mm;

3. Mushroom-shaped head (SUS304 SS) thickness: 3.0-4.0mm;

4. Insulation layer: PU/Rock Wool-thickness: 80mm;

5. Lauter tank equipped with plow knife;

6. CIP cleaning ball: Material: SUS 304; Comprehensive cleaning;

7. Polishing precision up to: Ra0.4µm;

8. Outsourcing surface: Plate protection and sand polish on welding seal.

Boiling/Whirlpool Tank:

1.Inner-Jacket (SUS304) thickness: 3.0-4.0mm;

2.External-Jacket (SUS304) thickness: 3.0-4.5mm;

3.Mushroom-shaped head (SUS304) thickness: 3.0-4.0mm;

4.Insulation layer: PU/Rock Wool-thickness: 80mm;

5.Heating way: Electricity heating/Steam heating/Direct fire heating;

6.Exhaust chimney for condensate;

7.CIP cleaning device: Material: SUS 304; Comprehensive cleaning;

8.Polishing precision up to Ra0.4µm;

9.Outsourcing surface: Plate protection and sand polish on welding seal.

The mash 

The mashing system is the key part in the whole beer equipment, like the CPU of the computer.

Fermentation system:

1.Inner material (SUS304) thickness: 3.0-4.0mm;

2.Outer-material (SUS304) thickness: 2.0-3.0mm;

3. Insulation: Polyurethane-thickness 80 mm;

4.Top manhole or side manhole(according to your needs)

5. 4 pcs completely SUS304 heavy duty legs with leveling pad and legs support

6. Glycol jacket: dimpled plate on side

7. Cooling media: glycol water or alcohol water

8. Design pressure 0.3Mpa,Working pressure 0.2Mpa

9. CIP arm with 360° coverage CIP spraying ball

10.Dry hops port on the top of tanks with butterfly valve and hopper

The fermentation tanks number is according to the monthout of beer the client's need.

The brewing equipment make different kinds of beer also effect the fermentation tanks number.  As different beer needs different fermentation period.

 Glycol Cooling System 

Glycol Tank:

1. Inner material (SUS304) thickness: 3.0-4.0mm;

2. Outer-material (SUS304) thickness: 2.0-3.0mm;

3.  Insulation: Polyurethane-thickness 80 mm;

4.  Internal and external plate protection and sand polish on welding seal;

5. Temperature mode: PT100 temperature probe, temperature transmitting, temperature control panel display;

6.  Feeding method: Ethylene glycol or alcohol water fill into the tank from the top manhole.

     Refrigeration water fill into ice water tank from the top manhole;

7. Discharging method: Ethylene glycol water discharge from the ethylene glycol outlet on bottom of ice water tank.

Refrigeration water discharge from the refrigeration water outlet on bottom of ice water tank.

We use high quality Australia Coolsoon or Copeland Compressor chiller, this will be very good use in the whole industrial beer equipment, effect the cooling of the beer.

Technica Description

 Large Beer Brewery Equipment Details:

   Mashing SystemMain equipmentMashing tun, lauter tun, kettle and whirlpool tank
OptionalCold liquid tank (CLT), hot liquid tank (HLT),Steam Boiler
Per batch30L--30000L per batch
Heating way

Steam heating, electric heating, direct fire heating

MaterialSUS304/316, Inner thickness: 3.0-4.0mm
InsulationPolyurethane/Rock wool, thickness: 80-150mm
Accessories Pump, pipeline, heat exchanger, valve, raker, platform, and all other accessaries
 UsageSeparate all sugar from grains and solve sugar in water.  Also solve hops in water. Then separate grains and impurities from water. Finally get pure wort
  Fermentation system Main equipment Several fermentation tanks. Quantity is decided by you
 Capacity 50L--30000L per tank
 Material  SUS304/316, thickness: 3.0-4.0mm
 Insulation Polyurethane/Rock wool, thickness: 80mm
 Cooling way Glycol water belt cooling
 Cone bottom 60° resist compression design
 Sampling method 1 piece of aseptic sampling valve
 Fermentation tank pressure Design pressure 0.3MPa; Working pressure 0.2Mpa
 Accessories Pump, pipeline, yeast adding tank, valve, and all other accessaries
 Usage Yeast has aerobic respiration and  anaerobic respiration in fermentation tank. Turn sugar into CO2 and alcohol. Finally we get original beer
  Refrigeration System Main equipment Glycol tank, Australia Coolsoon chiller,ABB pump
 Capacity 90L--90000L per tank
 Chiller Compressor is USA Copeland/Australia COOLSOON
 MaterialSUS304, thickness: 2.0-4.0mm 
 Insulation Polyurethane/Rock wool, thickness: 80mm
 Cooling media Glycol water or alcohol water
 Accessories Pump, pipeline, valve, and all other accessaries
 Usage Cool down wort when fermentation tank temperature is high. Control fermentation carries on under appropriate temperature. Sometime, ice water is also used to cold down hot wort before wort goes into fermentation tank
  CIP system Main equipmentDisfection tank, Alkalia tank
 UsageClean all tanks before brewing beer or finish brewing beer. Use NaOH to clean firstly, secondly is H2O2, finally is water. Then begin to brew beer
 Control System Main equipment Button control box or PLC control box
 Usage Control all the pump and motor. Control mashing system and CIP system manually, control fermentation tank temperature automatically.
 Optional system Auxiliary  Can also supply auto filling system, capping system, filtering system, water treatment system,  pasteurizer and so on

 

Our Services

1. We provide brewery technical support online service.

2. We provide CAD or 3D layout drawingafter get clients’s building plan.

3. We will provide production technology and brewing formula if the client’s need.

4. We will let our engineer going abroad for installation and technical training for the brewery equipment.

 

Company Information

 

Shandong Shendong Equipment Technology Co., Ltd. is one professional beer brewery equipment manufacture in China. We specialize in personally manufacturing small, medium and big sized brewery plants. We also manufacture all types and sizes of fermenting and storage tanks. Our breweries can be designed according to the specific wishes of our customers. We also can offer you a wide variety of technical solutions. We can provide beer to make by fermentation of the equipments of having, can train to make wine teacher.

Contract:

Packaging & Shipping

 

1. Sound production management and Reliable sea forwarder for many years guarantee the timely delivery.
2. Experienced package guarantee the quality of equipment and ensure customers’ satisfying.
3. Packing details: packing with steel stainless and wood cases, standard export package
4. Delivery details: delivery time within 30 days from Qingdao

FAQ

1.Q: How quickly after payment you could delivery the beer brewing equipment?

   A:The delivery time will be within 20-30wordking days, it depends on the numbers of the tank.

2.Q:What's the  service you can provide?

   A:Provide beer production technology and brewing formula,brewing equipment design, installation and  debugging, personnel training service;Providing CADand 3D layout drawing.

3.Q:What's the brewery equipment warranty time?

   A:Provide 5 years complete warrantee for beer brewing tanks body and life-time maintenance service;

   All of the accessories and auxuliaries facilities are guaranteed for one year

4.Q:How to check the quality before delivery?

   A: We have our professional engineers to check the beer brewing equipment quality before delivery, also we welcome you come to check the quality or let the third-party check the beer  equipment qualiy before the equipment delivery.

Certifications

Specialized in beer brewery equipment production for years;
Exported to more than 50 countries and regions in the world;
Owning technical engineers to design specially for customers as per their actual sites;
Having long term cooperated and more high reliable forwarder;
Super quality and wholehearted service
CE ISO PED certification
High quality and moderate price
Professional technician team are available for designing you the brewery equipment according to your requirements.

 

 Contact:

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like